Back to Projects

Team Name:

SJW & YKB


Team Members:


Evidence of Work

The Dawn of Data Centre

Project Info

SJW & YKB thumbnail

Team Name


SJW & YKB


Team Members


Sam and 1 other member with an unpublished profile.

Project Image

Team DataSets

Major Power Station

Description of Use Data centres need a lot of energy, therefore the most important thing to see if the energy is renewable which is obtainable in this dataset.

Data Set

Transmission Substation

Description of Use The nearer to these substation the easier to build a newer data centre.

Data Set

Electricity Transmission Line

Description of Use Added points if there is a transmission line nearby the potential data centre, easier to connect.

Data Set

Surface Hydrology Points (National)

Description of Use To use to the distance from these water bodies to calculate the algorithm of which location is best to build a new data centre

Data Set

Surface Hydrology Polygons (National)

Description of Use To use the distance from the water body to calculate the algorithm for the best possible location for the data centre.

Data Set

Challenge Entries

Data Centres: A Cornerstone of Australia's AI Future

How can we analyse Australia's infrastructure, energy, and geographic data to select locations and operational strategies that will position Australia as the Asia-Pacific's leading AI and cloud computing hub?

#Data-centres-for-2050

Eligibility: Open to all. Teams should use at least one government dataset in their solution, with preference for creative combinations across different data types (infrastructure, energy, telecommunications, geographic, climate, economic, or planning data). Proposals should include clear methodologies for data integration, analysis algorithms, and implementation planning with consideration of real-world deployment challenges

Go to Challenge | 11 teams have entered this challenge.